4.23.2011

Broomhill NSP Blog Part 2

Welcome to the second part of my blog. I may as well get straight to it, it's the start of April and time to weld the two halves of my sculpture together. I have chosen to do this by welding a metal 'tie' between the the two internal frames.
Above: Here you can see how I have welded the frames together and painted the steel tie with red oxide to protect the frame from rust.
Below: This is my setup for welding the sculpture. It is up on blocks so that I can gain access to the inside, this allows me to have 4 weld points; 1 in the face hole, 1 in the side hole, and 2 at the base.